Swiss
prev
prev

Search

MSDS
TDS
T&C's
Contact

Facilities Maintenance



Cracked floors, Damaged loading docks, redundant repairs on HVAC systems and Pneumatics. All of these contribute to downtime and to increased operating costs.The bottom line and cost reduction are very important to the Facility Maintenance and Contract Maintenance professional. 
 
Aero Consultant (UK) Ltd supply Loctite products.  For the Facility Maintenance Professional this can stop costly leaks, prevent equipment failure and permanently repair equipment.
 
Stop Costly Leaks and reduce utility consumption of the pneumatics and HVAC system. Quickly and permanently Repair damaged floor areas with a solution stronger than the original floor.Increase the life cycle and reduce the downtime of pumps, blowers and motor equipment.

Aero Engineering